Profile
Chengdu Metro Line 2 Tazishan Park Station 成都地铁2号线塔子山公园站
Line 2 of the Chengdu Metro starts at Longquanyi in the southeast and ends at Xipu in the northwest. Chinese: 成都地铁2号线; pinyin: Chéngdū Dìtiě Èr Hào Xiàn). This line began operation on September 16, 2012 and serves the Chengdu East Railway Station.
Covering 42 km in total and connecting 32 stations. The main stations include Chadianzi Bus Station, University of TCM (Provincial People’s Hospital), People’s Park, Chunxi Road, and East Railway Station. Currently, passengers can transfer easily to subway line 1 at Tianfu Square. In the future, transfers with line 3, line 4, line 5, and line 7 will be achieved.
Tazishan Park
Surroundings: Weisi Road, Xiashahepu Street, Xishui Street, Tazishan Park
Bus Routes:
Exit A: 47, 104, 313
Transfers along Chengdu Subway Line 2
*Yipintianxia & East Railway Station: Transfer with Line 7
*Chengdu University of TCM (Provincial People’s Hospital): Transfer with Line 4
*Tianfu Square: Transfer with Line 1
*Chunxi Road: Transfer with Line 3
Chengdu Metro Line 2 timetable:
Reviews
More Locations
Chengdu
Sichuan
大面镇
四川省