Profile
Chengdu Metro Line 4 West Qingjiang Road Station 清江西路
Line 4 of the Chengdu Metro runs in an east-west direction, stretching from Wansheng in Wenjiang to Xihe in the Longquanyi. Chinese: 成都地铁4号线; pinyin: Chéngdū Dìtiě Sì Hào Xiàn) started construction on 22 July 2011, and began operation on 26 December 2015.
It covers a distance of 40 km (25 mi) and passes 30 stations, linking Wannianchang and Intangible Cultural Heritage Park. Chengdu subway line 4 passes West Railway Station, Luomashi Commercial Zone, and several attractions such as Wide and Narrow Alley, Cultural Park, Sichuan Museum and Intangible Cultural Heritage Park.
Transfers to other metro lines:
*Huaishudian & Culture Palace: Transfer with Line 7
*2nd People’s Hospital: Transfer with Line 3
*Luomashi: Transfer with Line 1
*Chengdu University of TCM & Provincial People’s Hospital: Transfer with Line 2
Surroundings and Bus Routes:
West Qingjiang Road, Shujin Road, Bank of China, Industrial and Commercial Bank, Pacific Theater, Zhongda Junyue Plaza, Renhe Jinsha Community, Lansheng Jinsha Community, Huafu Jinsha Community, Xidan Shopping Mall, Construction Bank
Bus Routes: 13, 64, 163, 164, 175, 215, 736, 1062
Chengdu Metro Line 4 Timetable:
Reviews
More Locations
Dujiangyan
Sichuan
Chengdu City
Sichuan
Chengdu City
Sichuan