Profile
Chengdu Metro Line 3 2nd People’s Hospital Station 第二人民医院
(Chinese: 成都地铁3号线; pinyin: Chéngdū Dìtiě Sān Hào Xiàn)
runs in a northeast-southwest direction from Chengdu Military General Hospital to Taipingyuan with the cost of CNY3-5. The current operating route (phase one), passes 17 stations total length is 20.33 km.
Line 3’s color is magenta. Phase 1 of this line began construction on 28 April 2012, and opened on 31 July 2016. The phase two and three are expected to serve the public in early 2019.
Surroundings: Yuefu Street, Wucheng Avenue, 2nd People’s Hospital, Jinjiang District Tourism Administration, Sichuan Media Mansion, Heping Street Primary School, Xiaobang Hotel, Bank of China
Bus Routes: 3, 6, 8, 18, 20, 28, 37, 49, 152, 154, 166, 341
Bus Routes: 1, 84, 139, 147, 174, 222
Transfers along Chengdu Subway Line 3
*Sichuan Gymnasium: transfer with line 1
*Chunxi Road: transfer with line 2
*2nd People’s Hospital: transfer with line 4
*Gaoshengqiao: transfer with line 5 (under construction)
*Simaqiao and Taipingyuan: transfer with line 7 (under construction)
*Taipingyuan: transfer with line 10
Chengdu Metro Line 3 timetable:
Reviews
More Locations
Chengdu
Sichuan
大面镇
四川省