Profile
Chengdu Metro Line 3 Zoo Station 动物园
(Chinese: 成都地铁3号线; pinyin: Chéngdū Dìtiě Sān Hào Xiàn)
runs in a northeast-southwest direction from Chengdu Military General Hospital to Taipingyuan with the cost of CNY3-5. The current operating route (phase one), passes 17 stations total length is 20.33 km.
Line 3’s color is magenta. Phase 1 of this line began construction on 28 April 2012, and opened on 31 July 2016. The phase two and three are expected to serve the public in early 2019.
Surroundings: West Jingzhu Road, Chengdu Zoo, Zhaojue Temple, Hanting Express Hotel, Industrial and Commercial Bank, Zhaojuesi Bus Station, Donglin Commercial Plaza, Beixin Experimental Primary School, Xiyue Plaza, 7 Days Inn
Bus Routes: 85, 150, 527, 1035
Transfers along Chengdu Subway Line 3
*Sichuan Gymnasium: transfer with line 1
*Chunxi Road: transfer with line 2
*2nd People’s Hospital: transfer with line 4
*Gaoshengqiao: transfer with line 5 (under construction)
*Simaqiao and Taipingyuan: transfer with line 7 (under construction)
*Taipingyuan: transfer with line 10
Chengdu Metro Line 3 timetable:
Reviews
More Locations
Chengdu
Sichuan
大面镇
四川省